Granny Flat & Garden Home Planning Exemption Ireland 2026 | Kilrush Ventures, Ennis
Please note

Information on this page is accurate as of {{ todayStr }}. Planning law changes, and rules can vary by local authority. Please check with your own local authority before making any decisions.

New rules, since 27 July 2026

The planning rules moved in your favour

The first real change in almost twenty five years. A habitable dwelling can now go in the back garden of a house in Ireland without a planning application, and the units we build are sized to sit inside that range.

Talk it through with us Read the announcement
{{ p.figure }}

{{ p.title }}

{{ p.body }}

The new exemption, in one number
32–45 m²

That's roughly three car parking spaces — a full habitable home, exempt from planning permission in your back garden.

No planning application
A prior notification replaces it. Nothing to wait months on.
14 days notice
Tell the council what's going in. If they don't object, you build.
30 m² for garden structures
Sheds, offices and stores get their own, smaller exemption too.
How it works in practice

Notice to the council, not an application

An application is something you wait on. A prior notification is something you send. Fourteen days before work starts you tell the local authority what you are putting in, and unless they come back to you, you go ahead.

We give you the dimensions of the unit you are ordering so you have the numbers in front of you when you contact the council. We are not planning consultants and we do not lodge the notice for you.

Not sure where to start
We'll talk you through it

Ring us with your garden in mind and we'll tell you what fits before you contact the council.

Call 087 435 4655
{{ s.no }}
{{ s.title }}

{{ s.body }}

Read this part too

What the exemption does not cover

The exemption is generous but it is not a blank cheque. Your local authority has the final word on your particular site.

SITE BOUNDARY Your house New unit 32–45 m², single storey SETBACK DETACHED FROM THE HOUSE
Schematic only — your own boundary distances and site layout are confirmed with your local authority.
{{ c.title }}

{{ c.body }}

General guidance on planning in Ireland is on Citizens Information. For your own site, the only answer that counts comes from your local authority.

Once the notice is in

Delivery, straight onto the base

We deliver on our own crane truck, so the unit goes from the lorry onto the base without a third party in the middle. Free delivery in Munster. Contact us for delivery prices outside of Munster.

What we need ready on your side: a level base that will take up to twelve tonnes, room for a lorry and a crane to get in, and power and water run to the spot. Lifting over a wall or into a tight garden is possible, but it is arranged separately and costs extra.

Customer preview showing a proposed unit's real-scale outline placed in a back garden, with dimensions labelled
Illustrative — actual placement depends on your site.
Sized for it
Units built to the range

Granny flats and larger pods at 32 to 45 m², garden offices up to 30.

More answers
Questions we get

Letting, delivery, warranty, connections and cost.

Bring your site
Come and ask us

Ennis, Monday to Saturday, 10am to 4pm.